 |
 |
Restaurants see better than average returns on cost segregation. As much as 40 percent of total construction cost can be reclassified, whether the project is built ground-up, purchased as an existing structure, or leased and renovated.
Not doing any construction? If your building was completed after 1986 you may be able to “catch-up” deprecation for all the years between 1987 and the present, using a cost segregation study.
Call today for a free evaluation of your potential savings!
OTHER RESTAURANT SERVICES
Orbit Builders works with Restaurant Incubator to provide restaurant site evaluations, restaurant design consultation and construction analysis. www.restaurantincubator.com
< previous page
|